» » page 2

Georgian English
 
 
 

Lanchkhuti

Ordered by Ltd "Socar Georgia Gas"

Lanchkhuti. Rehabilitation of the high pressure metal pipeline d=200mm.
 

Village izilagjlo, Marneuli Region

Ordered by Ltd "Socar Petroleum"

Village izilagjlo, Marneuli Region. Construction of Natural gas pipeline on the territory of ‘Socar Georgia Petroleum’. Also GGS and the yard arrangement. Installation of high pressure pipeline d=114mm - 100m.
 

Shartava Street, Rustavi City

Ordered by Ltd "Socar Petroleum"

Shartava Street, Rustavi City. Construction of Natural gas pipeline on the territoty of ‘Socar Georgia Petroleum’. total length - 5800 m. Underground polyethylene pipeline d=110mm - 5800m.
 

Rustavi City

Ordered by Ltd "Socar Petroleum"

Rustavi City. Construction of gas pipeline on the territoty of ‘Socar Georgia Petroleum’. Total length- 7800m. Underground polyethylene pipeline - d=110mm - 200m; d=125mm - 6800 mand metal pipeline d=127mm - 800m.
 

Gguramishvili street, Tbilisi

Ordered by Ltd "Socar Petroleum"

Gguramishvili street, Tbilisi. Construction of Natural gas pipeline on the territoty of ‘Socar Georgia Petroleum’.Total length - 400m. Undergroung polyethylene pipeline d=110mm - 420m.
 

Varketili region, Tbilisi

Ordered by Ltd "Socar Petroleum"

Varketili region, Tbilisi. Construction of Natural gas pipeline on the territoty of ‘Socar Georgia Petroleum’.
 

Sheshelidze street, Gldani, Tbilisi

Ordered by Ltd "Socar Petroleum"

Sheshelidze street, Gldani, Tbilisi. Construction of Natural gas pipeline on the territory of ‘Socar Georgia Petroleum’.Total length - 4500m. Underground polyethylene pipeline d=200mm - 3850m, metal pipes d=219mm - 655m.
 

Lanchkhuti

Ordered by Ltd "Socar Georgia Gas"

Lanchkhuti. Rehabilitation works: 300mm underground metal pipe was replaced by 200mm polyethylene pipe (400m). Installation of 80m pipeline under the railway.
 

Village Akhalsopeli, Zugdidi

Ordered by Gas and Oil Transportation Company

Village Akhalsopeli, Zugdidi. Construction of new gas pipeline.7 river/bridge crossing .Metal pipe d=50: 89 and 159mm. Total length - 371m.
 

Village Tsitatskari, Zugdidi

Ordered by Ltd "Socar Petroleum"

Village Tsitatskari, Zugdidi. Construction of Natural gas pipeline on the territoty of ‘Socar Georgia Petroleum’.Total length– 4670m. Undergroung polyethylene pipeline – 110mm.